Farrier F39 Trimaran – Main Hull Build
Blackline took over a partially built main hull construction of an F39 Farrier Trimaran. The object was to complete the structural build and fair the exterior and interior to a paint ready stage. The construction was Core-Cell (SAN) foam core laminated both sides with East System epoxy and biaxial/unidirectional glass fabrics, then faired and primed with Awlgrip primers.